
Smarten Power Systems SME IPO GMP Today
ListedUpdated 10 July 2025, 5:30 PM IST· NSE SME· Listing 14 Jul 2025
Smarten Power Systems SME IPO opens on 7 July 2025. Smarten Power Systems SME IPO GMP is Rs 15.00 today. Listing price estimate is Rs 115.00 (issue price Rs 100.00). Listing gain estimate: 15.00%.
Smarten Power Systems SME IPO GMP Day Wise
Daily grey market premium, estimated listing price, and profit per lot
GMP for Smarten Power Systems SME started at Rs 0 on 2 July 2025 and stood at Rs 7 on 10 July 2025. The sharpest single-day jump was from Rs 0 on 8 Jul 2025 to Rs 7 on 9 Jul 2025. The upward move through the subscription window usually reflects building demand across investor categories rather than a one-day spike.
| Date | Issue Price | GMP | Listing Price | Est. Profit |
|---|---|---|---|---|
| 10 Jul 2025Today | Rs 100.00 | Rs 7.00 | Rs 107.00 (+7.00%) | Rs 16,800.00 |
| 9 Jul 2025 | Rs 100.00 | Rs 7.00 | Rs 107.00 (+7.00%) | Rs 16,800.00 |
| 8 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
| 7 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
| 6 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
| 5 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
| 4 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
| 3 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
| 2 Jul 2025 | Rs 100.00 | Rs 0.00 | Rs 100.00 (+0.00%) | Rs 0.00 |
Smarten Power Systems SME IPO Listing Price
Estimated from today’s GMP
Based on today's GMP, Smarten Power Systems SME IPO listing price estimate is Rs 115.00 per share (issue price Rs 100.00 + GMP Rs 15.00).
Actual listing price will be known on 14 July 2025 when the stock lists on NSE/BSE.
Smarten Power Systems SME IPO Listing Gain
Estimated profit per lot from grey market premium
Lot size: 1200 shares (min. 2 lots for SME)
GMP today: Rs 15.00
Estimated listing gain per lot: Rs 15.00 × 2400 = Rs 36,000.00
GMP at roughly 15.0% suggests solid informal demand. The grey market expects the stock to list noticeably above the issue price.
GMP has moved up over the tracked period. Steady increases through the subscription window are usually a stronger signal than a single-day spike.
GMP is unofficial. Listing gain can differ on listing day.
Smarten Power Systems SME IPO Subscription Status
GMP and subscription numbers often move together. When institutional and HNI demand is strong, grey market participants usually price in a higher premium. Current overall subscription for Smarten Power Systems SME is 5.51x. Compare this with the GMP trend to see if demand aligns. The GMP move around 9 Jul 2025 may reflect how the market reacted once the subscription window activity picked up after 7 Jul 2025.
See live figures on the Smarten Power Systems SME IPO Subscription Status page.
Smarten Power Systems SME IPO Details
| Field | Value |
|---|---|
| Price Band | ₹100.00 |
| Issue Size | ₹47.50 Cr |
| Lot Size | 1200 shares |
| IPO Type | NSE SME |
| Open Date | 7 Jul 2025 |
| Close Date | 9 Jul 2025 |
| Listing Date | 14 Jul 2025 |
| Subscription | 5.51x |
Smarten Power Systems SME IPO full details (financials, peers, review).
About Smarten Power Systems SME
Smarten Power Systems Limited, established in 2014, specializes in designing, assembling, and supplying a wide range of power backup and energy-efficient solutions, particularly focusing on solar power products. Their key products include Home UPS systems, solar inverters (pure sine wave and hybrid), solar power conditioning units (PCUs), solar charge controllers (MPPT-based), tubular batteries, and EV chargers (an emerging product line). The company also trades in solar panels and batteries. Smarten operates a hybrid B2B2C model, distributing products domestically across 23 states and 2 union territories through a network of 380 distributors and 52 service centers. They also export to over 18 countries, including the Middle East, Africa, and South Asia
Smarten Power Systems SME IPO GMP FAQs
What is Smarten Power Systems SME IPO GMP today?
Smarten Power Systems SME IPO GMP is ₹15 as of 27 August 2026, 4:47 AM IST. At issue price ₹100, that is +15.00% expected listing gain in the grey market.
What is Smarten Power Systems SME IPO grey market premium (GMP)?
The grey market premium (GMP) for Smarten Power Systems SME IPO is ₹15 today. GMP is the unofficial premium traders pay above the issue price of ₹100 before listing on NSE/BSE.
What is Smarten Power Systems SME IPO expected returns?
Smarten Power Systems SME IPO expected returns based on today's GMP are +15.00% over the issue price of ₹100. Estimated listing price is ₹115 per share. Actual listing gain on 14 July 2025 may differ.
What is the estimated listing price of Smarten Power Systems SME IPO?
Based on today's GMP, Smarten Power Systems SME IPO estimated listing price is ₹115 per share (issue price ₹100 + GMP ₹15). The actual listing price will be set on 14 July 2025 when trading starts.
What is the expected profit per lot in Smarten Power Systems SME IPO?
At GMP of ₹15 and lot size of 1200 shares (minimum 2 lots for SME), estimated grey market profit is ₹36,000 (2 lot × 1200 shares × ₹15). This is unofficial and not guaranteed on listing day.
Will Smarten Power Systems SME IPO list at GMP price?
Smarten Power Systems SME IPO may list around ₹115 based on current GMP of ₹15, but listing at exact grey market price is not guaranteed. GMP is unofficial. On 14 July 2025, the opening price depends on market sentiment, final subscription, and index levels.
What is Smarten Power Systems SME IPO issue price and lot size?
Smarten Power Systems SME IPO issue price is ₹100 per share (price band ₹100.00). Lot size is 1200 shares. Minimum application is 2 lots for SME.
When is Smarten Power Systems SME IPO listing date?
Smarten Power Systems SME IPO is expected to list on 14 July 2025 on NSE and BSE. GMP can still move until listing day.
What is Smarten Power Systems SME IPO GMP high and low?
Smarten Power Systems SME IPO GMP made a high of ₹7 on 10 Jul 2025 and a low of ₹0 on 8 Jul 2025 in tracked grey market data.
Can Smarten Power Systems SME IPO GMP change after subscription closes?
Yes. Smarten Power Systems SME IPO closed on 9 July 2025. GMP often moves until listing (14 July 2025) based on allotment buzz, market mood, and news. Keep this page handy for the latest figure.
What is Smarten Power Systems SME IPO subscription status?
Live category-wise subscription for Smarten Power Systems SME IPO is on the Smarten Power Systems SME IPO Subscription Status page on IPOwiz, including QIB, NII, and retail figures.
How to check Smarten Power Systems SME IPO allotment status?
You can check Smarten Power Systems SME IPO allotment with your PAN on the Smarten Power Systems SME IPO Allotment Status page, the registrar site, BSE, or the IPOwiz App.
Sources
We match Smarten Power Systems SME IPO numbers with official sources. For final dates and allotment results, double-check the registrar or exchange.
- SEBIRules for IPO allotment and disclosures in India
- NSEExchange notices, bidding data, and listing updates
- BSEExchange notices and IPO allotment check tools
- RHP / Offer DocumentCheck the company RHP on NSE/BSE or the IPO detail page
- IPO RegistrarRegistrar details are on the allotment page for this IPO
Also read our Editorial Policy, How GMP is calculated, How allotment chances work, and IPO fund allocation.
Reviewed by
Dinesh Agrawal · Lead IPO Analyst
15+ years in Indian markets and IPO research. He reviews GMP figures before they go live.