
Karamtara Engineering IPO Subscription
ListedUpdated 17 September 2026, 9:15 AM IST· Mainboard
Karamtara Engineering IPO subscription closed on 11 September 2026 at 66.01x overall by shares. QIB demand came in at 168.19x, NII at 51.17x, and retail at 13.98x. See Retail, SHNI, and BHNI allotment chances in the…
Karamtara Engineering IPO subscription closed on 11 September 2026 at 66.01x overall by shares. QIB demand came in at 168.19x, NII at 51.17x, and retail at 13.98x. See Retail, SHNI, and BHNI allotment chances in the table below.
Show moreShow less
Allotment date is 15 September 2026. Listing date on NSE and BSE is 17 September 2026.
Karamtara Engineering IPO Day-wise Subscription
Daily QIB, NII, Retail, and overall subscription as bids come in
| Day | QIB | NII | Retail | Overall |
|---|---|---|---|---|
| Day 1 - 9 Sept 2026 | 1.26x | 1.90x | 1.13x | 1.34x |
| Day 2 - 10 Sept 2026 | 2.40x | 6.49x | 3.46x | 3.80x |
| Day 3 - 11 Sept 2026 | 168.19x | 51.17x | 13.98x | 66.01x |
Karamtara Engineering IPO Allotment Chances
Retail, SHNI, and BHNI chances based on application subscription
Karamtara Engineering IPO allotment chances for Retail, SHNI, and BHNI. All three use lottery when the category is oversubscribed.
| Category | Subscription (Apps) | Allotment Chances |
|---|---|---|
| Retail | 12.74x | 1 in 13 |
| SHNI (Rs 2L to Rs 10L) | 44.88x | 1 in 45 |
| BHNI (above Rs 10L) | 10.93x | 1 in 11 |
Chances use application subscription (how many bids came in), not share or amount figures. If you get allotment, you get at least one lot. Higher subscription means lower chance per PAN.
Check the Karamtara Engineering IPO Allotment Status page from 15 September 2026 for your result.
Karamtara Engineering IPO Subscription by Amount
Category-wise subscription based on amount applied at issue price Rs 254.00
| Category | Amount Offered | Amount Applied | Subscription |
|---|---|---|---|
| QIB | Rs 175.00 Cr | Rs 29,434.03 Cr | 168.19x |
| FII | - | Rs 11,217.77 Cr | - |
| DFI | - | Rs 15,064.99 Cr | - |
| Mutual Funds | - | Rs 1,379.50 Cr | - |
| Other | - | Rs 1,771.77 Cr | - |
| NII | Rs 131.25 Cr | Rs 6,715.51 Cr | 51.17x |
| bNII (above Rs 10L) | Rs 87.50 Cr | Rs 4,710.50 Cr | 53.83x |
| Corporate | - | Rs 79.09 Cr | - |
| Individual | - | Rs 4,447.42 Cr | - |
| Other | - | Rs 183.99 Cr | - |
| sNII (Rs 2L to Rs 10L) | Rs 43.75 Cr | Rs 2,005.01 Cr | 45.83x |
| Corporate | - | Rs 9.42 Cr | - |
| Individual | - | Rs 1,929.77 Cr | - |
| Other | - | Rs 65.82 Cr | - |
| Retail | Rs 306.25 Cr | Rs 4,280.95 Cr | 13.98x |
| Cut-off price | - | Rs 3,755.83 Cr | - |
| Fixed price | - | Rs 525.12 Cr | - |
| Total | Rs 612.50 Cr | Rs 40,430.48 Cr | 66.01x |
Karamtara Engineering IPO Subscription by Applications
Category-wise subscription based on applications received
| Category | Applications Offered | Applications Received | Subscription |
|---|---|---|---|
| QIB | 68,89,765 | 552 | 0.00x |
| FII | - | 63 | - |
| DFI | - | 44 | - |
| Mutual Funds | - | 15 | - |
| Other | - | 430 | - |
| NII | 6,256 | 1,39,171 | 22.25x |
| bNII (above Rs 10L) | 4,171 | 45,593 | 10.93x |
| Corporate | - | 756 | - |
| Individual | - | 43,253 | - |
| Other | - | 1,584 | - |
| sNII (Rs 2L to Rs 10L) | 2,085 | 93,578 | 44.88x |
| Corporate | - | 405 | - |
| Individual | - | 90,073 | - |
| Other | - | 3,100 | - |
| Retail | 2,04,357 | 26,03,866 | 12.74x |
| Cut-off price | - | 22,77,779 | - |
| Fixed price | - | 3,26,087 | - |
| Total | 71,00,378 | 27,43,589 | 0.39x |
What Do These Subscription Numbers Mean?
66.01x overall by shares means bids covered about 66 times the shares on offer. Allotment chances depend on applications in each category.
QIB at 168.19x by shares shows institutional demand from mutual funds, FIIs, and banks.
NII covers bids above Rs 2 lakh (22.25x by applications). Split: SHNI 44.88x, BHNI 10.93x by applications. SHNI and BHNI allotment is by lottery.
At 12.74x subscription by applications, about 1 in 13 retail applicants may get allotment (~8% chance per application). Retail allotment is also by lottery.
Karamtara Engineering IPO GMP After Subscription
GMP for Karamtara Engineering IPO stands at Rs 46.00 today, giving an estimated listing price of Rs 300.00 per share.
The GMP has moved up from Rs 40.00 on 4 Sept 2026 to Rs 46.00 on 17 Sept 2026.
A subscription of 66.01x combined with a GMP of 18.11% is a strong combination heading into listing. QIB demand above 50x in particular tends to support listing sentiment, as institutional investors are seen as informed buyers.
Track live GMP on the Karamtara Engineering IPO GMP Today page or the IPOwiz Live IPO GMP Tracker.
Karamtara Engineering IPO Key Dates
| Event | Date |
|---|---|
| IPO Open Date | 9 September 2026 |
| IPO Close Date | 11 September 2026 |
| Allotment Date | 15 September 2026 |
| Refund Initiation | 16 September 2026 |
| Share Credit to Demat | 16 September 2026 |
| Listing Date | 17 September 2026 |
| Minimum Investment | Rs 14,986.00 |
| Lot Size | 59 shares |
About Karamtara Engineering IPO
Incorporated in 1996, Karamtara Engineering Limited is a premier integrated manufacturer specializing in products for the renewable energy and power transmission sectors. The company functions as a one-stop-shop for solar module mounting structures (fixed-tilt and tracker components), overhead transmission line (OHTL) hardware fittings, industrial fasteners, and lattice transmission towers with handling capabilities of up to 1,200 kV. With 13 manufacturing facilities spanning Maharashtra, Gujarat, and an overseas unit in Italy, Karamtara operates India's largest in-house hot-dip galvanizing capacity (258,000 MTPA) in the solar sector and serves a diversified global footprint across 50+ countries in North America, Europe, Africa, and Australia.
Understanding Subscription Categories
QIB - Qualified Institutional Buyers
Includes foreign institutional investors, domestic financial institutions, mutual funds, and other qualified institutions. QIB demand is considered the most reliable indicator of institutional confidence in an IPO.
NII - Non-Institutional Investors (SHNI & BHNI)
Investors bidding above Rs 2 lakh. Split into SHNI (Rs 2 lakh to Rs 10 lakh) and BHNI (above Rs 10 lakh). Both use lottery allotment when oversubscribed.
Retail - Retail Individual Investors
Investors bidding up to Rs 2 lakh per PAN. Allotment is by lottery when oversubscribed. Winners get at least one lot.
Karamtara Engineering IPO IPO Pages
Open related pages for this IPO: details, GMP, subscription, allotment, review, FAQ, registrar, timeline, and news.
Karamtara Engineering IPO Details
Issue size, price, financials, and company info
Karamtara Engineering IPO GMP
Live grey market premium and listing estimate
Karamtara Engineering IPO Subscription
QIB, NII, Retail, SHNI and BHNI subscription
Karamtara Engineering IPO Allotment
Allotment date, chances, and check by PAN
Karamtara Engineering IPO Review
SWOT, strengths, risks, and IPO review
Karamtara Engineering IPO FAQ
Common questions on dates, GMP, and allotment
Karamtara Engineering IPO Registrar
Registrar website and how to check allotment
Karamtara Engineering IPO Timeline
Open, close, allotment, and listing dates
Karamtara Engineering IPO News
Updates, blogs, and latest IPO news
Karamtara Engineering IPO Subscription FAQs
What is Karamtara Engineering IPO subscription status today?
Karamtara Engineering IPO subscription closed on 11 September 2026 with overall subscription of 66.01x (by shares) as of 12 October 2026, 5:32 AM IST. QIB 168.19x, NII 22.25x, Retail 12.74x.
What is the overall subscription of Karamtara Engineering IPO?
Karamtara Engineering IPO is subscribed 66.01x overall by shares at close on 11 September 2026. QIB 168.19x, NII 22.25x, and Retail 12.74x.
What is Karamtara Engineering IPO QIB subscription?
Karamtara Engineering IPO QIB (Qualified Institutional Buyers) subscription is 168.19x by shares. QIB includes mutual funds, FIIs, banks, and other institutions.
What is Karamtara Engineering IPO Retail subscription?
Karamtara Engineering IPO Retail subscription is 12.74x by applications. Retail bids are up to Rs 2 lakh per PAN.
What is Karamtara Engineering IPO NII, SHNI, and BHNI subscription?
Karamtara Engineering IPO NII subscription is 22.25x by applications. NII is bids above Rs 2 lakh, split into SHNI (Rs 2L to Rs 10L) at 44.88x and BHNI (above Rs 10L) at 10.93x.
What are Karamtara Engineering IPO retail allotment chances?
At 12.74x subscription by applications, about 1 in 13 retail applicants may get allotment (~8% chance per application). Allotment is by lottery. Share subscription was 13.98x. Allotment chances use applications, not share volume.
What are Karamtara Engineering IPO SHNI allotment chances?
At 44.88x subscription by applications, about 1 in 45 SHNI applicants may get allotment (~2% chance per application). Allotment is by lottery. Share subscription was 45.83x. Allotment chances use applications, not share volume.
What are Karamtara Engineering IPO BHNI allotment chances?
At 10.93x subscription by applications, about 1 in 11 BHNI applicants may get allotment (~9% chance per application). Allotment is by lottery. Share subscription was 53.83x. Allotment chances use applications, not share volume.
When is Karamtara Engineering IPO allotment date?
Karamtara Engineering IPO allotment date is 15 September 2026. Check Karamtara Engineering IPO Allotment Status on IPOwiz from that day using your PAN.
When does Karamtara Engineering IPO subscription close?
Karamtara Engineering IPO subscription closed on 11 September 2026. No new applications are accepted after the close.
What is Karamtara Engineering IPO GMP today?
Karamtara Engineering IPO GMP is ₹46 today (+18.11% over issue price ₹254). See live GMP on the Karamtara Engineering IPO GMP Today page.
What is Karamtara Engineering IPO issue price and lot size?
Karamtara Engineering IPO issue price is ₹254 per share. Lot size is 59 shares. Minimum investment is ₹14,986 per lot. Issue size: ₹875.00 Cr.
When is Karamtara Engineering IPO listing date?
Karamtara Engineering IPO listing date is 17 September 2026 on NSE and BSE. Allotment is on 15 September 2026.
How does subscription affect Karamtara Engineering IPO allotment?
In Karamtara Engineering IPO, Retail, SHNI, and BHNI allotment is by lottery when oversubscribed. Chances follow application subscription in each category, not share volume. At 66.01x overall, competition is very high.
For allotment results from 15 September 2026, visit the Karamtara Engineering IPO Allotment Status page. For listing day updates on 17 September 2026, download the IPOwiz App.
Sources
We match Karamtara Engineering IPO IPO numbers with official sources. For final dates and allotment results, double-check the registrar or exchange.
- SEBIRules for IPO allotment and disclosures in India
- NSEExchange notices, bidding data, and listing updates
- BSEExchange notices and IPO allotment check tools
- RHP / Offer DocumentCheck the company RHP on NSE/BSE or the IPO detail page
- IPO RegistrarRegistrar details are on the allotment page for this IPO
Also read our Editorial Policy, How GMP is calculated, How allotment chances work, and IPO fund allocation.
Reviewed by
Dinesh Agrawal · Lead IPO Analyst
15+ years in Indian markets and IPO research. He reviews subscription data before it goes live.